Start with volume
Concrete is normally estimated by volume. For a rectangular pour, multiply finished length by width by depth using compatible units.
A 5 m × 4 m slab at 100 mm thick is 5 × 4 × 0.1 = 2.00 m³ before allowance.
Allow for real site conditions
Excavations are rarely perfectly rectangular. Uneven formation, over-dig, spillage and level corrections can increase the quantity placed. A contingency is therefore useful, but it should reflect the job rather than being applied blindly.
Footings and strips
Strip footings use the same rectangular-volume relationship. Measure the actual trench length, average width and intended concrete depth. Where trench width varies, split the footing into sections and add their volumes.
Post holes
For round post holes, calculate the cylinder volume using π × radius² × depth. Where useful, subtract the portion occupied by the post. Irregular augered or hand-dug holes may require more concrete than ideal geometry suggests.
Bagged concrete
Bag count depends on the yield of the exact dry mix. Divide required concrete volume by the manufacturer-stated yield per bag, then round up to a whole bag. Do not assume every 20 kg, 25 kg, 60 lb or 80 lb product has the same yield.
Regional and ordering checks
BuildCalc supports the United Kingdom, United States, Canada, Australia, New Zealand, Ireland and South Africa. The geometry is universal, but terminology, units, pack sizes and common product dimensions differ. Use the dimensions printed on the product you intend to buy rather than assuming a regional default is exact.
Before ordering, confirm excavation dimensions, reinforcement requirements, access, placing method and whether the supplier quotes wet volume, dry ingredients or product yield.
Use the related calculators
Use the calculator for your measurements, then return to this guide to check assumptions, allowances and ordering considerations.
Concrete slab calculatorFootings calculatorPost-hole concrete calculatorConcrete bags calculator